Close Menu
  • Tech Insights
  • Laptops
  • Mobiles
  • Gaming
  • Apps
  • Money
  • Latest in Tech
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
TechzLab – Tech News, Gadgets, Mobile, IT Updates & ReviewsTechzLab – Tech News, Gadgets, Mobile, IT Updates & Reviews
  • Tech Insights
  • Laptops
  • Mobiles
  • Gaming
  • Apps
  • Money
  • Latest in Tech
TechzLab – Tech News, Gadgets, Mobile, IT Updates & ReviewsTechzLab – Tech News, Gadgets, Mobile, IT Updates & Reviews
Home » Meta adds another 650 MW of solar power to its AI push | TechCrunch
Money

Meta adds another 650 MW of solar power to its AI push | TechCrunch

adminBy adminMay 22, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email


Meta signed another big solar deal on Thursday, securing 650 megawatts across projects in Kansas and Texas.

American utility and power generation company AES is currently developing the solar-only projects, with 400 megawatts to be deployed in Texas and 250 megawatts in Kansas, the company told TechCrunch.

Meta said it signed the deal to power its data centers, which have been expanding to support its growing AI operations. The company already has more than 12 gigawatts of capacity in its renewable power portfolio.

AES typically signs new power purchase agreements two to three years before they begin commercial operations, and the average term for such deals is 15 to 20 years, spokesperson Katie Lau said.

This is the fourth solar deal that Meta has announced this year. All are in Texas, with one clocking in at 595 megawatts, another at 505 megawattsand the final two hitting 200 megawatts each.

Texas has become a hotbed of solar development recently, leading the nation in new solar capacity installed in 2023 and 2024, according to the Solar Energy Industries Association. The state has ample sunshine, quick permitting, and speedy grid connections.

The latter two are particularly helpful when deploying a new solar capacity. With permitting and grid connections in place, a solar farm can be built in months rather than years. It doesn’t hurt that new solar is one of the cheapest forms of new generating capacity, even before subsidies are considered.

Plus, data centers needn’t wait for construction to finish since solar farms can be phased in, with electricity flowing before project completion. Indeed, in a press release, AES CEO Andrés Gluski called out solar’s “fast time-to-power and low-cost electricity” as key attributes that have attracted hyperscalers like Meta.



Source link

aes Artificial Intelligence (AI) data centers Meta renewable power Solar Power
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Opaque recurrence, and other AI terms that you should probably know | TechCrunch

September 7, 2026

Sam Altman is ready to decelerate | TechCrunch

July 28, 2026

PSA: your Claude shared chats and Artifacts may have ended up on Google | TechCrunch

July 27, 2026
Leave A Reply Cancel Reply

Comment moderation is enabled. Your comment may take some time to appear.

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Latest
  • Apple MacBook Pro with PROLED XDR Display 16-inch (2026, M5 Max) review: was the touchscreen worth the wait? November 5, 2026
  • The Biggest New Game Releases Of November 2026 November 1, 2026
  • Apple’s 512GB Mac Studio Now Costs $22,299: Here’s What You Get November 1, 2026
  • Planet Zoo 2 review: an even more diverse, creative zoo-builder October 28, 2026
  • I’ve tested the Asus ProArt P16 RTX Spark for two weeks and its powerful Nvidia chip has blown me away with its awesome AI, gaming and creative performance — but its high price still makes it a tough sell October 28, 2026
We are social
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo

Subscribe to Updates

Get the latest creative news from Techzlab.

Tags
AI Amazon Anthropic Apple artificial intelligence ChatGPT cybersecurity data centers defense tech Donald Trump electric vehicles Elon Musk evergreens EVs Exclusive Fintech gemini Google Grok In Brief India jack dorsey Layoffs Meta Microsoft Mythos nvidia nvidia gtc Nvidia GTC 2026 Openai Perplexity Polymarket Redwood Materials sam altman Sequoia Capital siri social media Softbank SpaceX Spotify Tesla Truecaller Uber Windows X
Archives
Quick Link
  • Apps (407)
  • From the Editor (4)
  • Gaming (387)
  • Laptops (409)
  • Latest in Tech (405)
  • Mobiles (409)
  • Money (229)
  • Tech Insights (411)
Don't miss

Apple’s 512GB Mac Studio Now Costs $22,299: Here’s What You Get

November 1, 2026

EA Sports FC 27 review: come for The Grounds, stay for Career

October 18, 2026

Price, Models, Gemini Features, and Everything to Know

September 27, 2026
Follow us
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
© 2026 Techzlab.com Designed and Developed by WebExpert.
  • Home
  • From the Editor
  • Money
  • Privacy Policy
  • Contact

Type above and press Enter to search. Press Esc to cancel.