Close Menu
  • Tech Insights
  • Laptops
  • Mobiles
  • Gaming
  • Apps
  • Money
  • Latest in Tech
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
TechzLab – Tech News, Gadgets, Mobile, IT Updates & ReviewsTechzLab – Tech News, Gadgets, Mobile, IT Updates & Reviews
  • Tech Insights
  • Laptops
  • Mobiles
  • Gaming
  • Apps
  • Money
  • Latest in Tech
TechzLab – Tech News, Gadgets, Mobile, IT Updates & ReviewsTechzLab – Tech News, Gadgets, Mobile, IT Updates & Reviews
Home » Google inks deal to develop 1.8 GW of advanced nuclear power | TechCrunch
Money

Google inks deal to develop 1.8 GW of advanced nuclear power | TechCrunch

adminBy adminMay 9, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email


Google and nuclear site developer Elementl Power announced this week that they will work together on three sites for advanced nuclear reactors.

The tech company has been rushing to lock up energy sources as its AI ambitions drive growing power demands at its data centers. This year alone, Google plans to spend $75 billion building data center capacity.

With the new deal, Google is promising to add at least 600 megawatts of generating capacity at each of the three sites. Elementl said the reactors will be connected to the grid “with the option for commercial off-take,” meaning that Google can buy power directly.

Elementl has been operating stealthily until this announcement. The team has experience in the nuclear industry, though it hasn’t developed any power plants yet. The company was started by Breakwater North and is backed by Energy Impact Partners.

Elementl is taking a “technology agnostic” approach, meaning that it hasn’t decided on which small modular reactor (SMR) company it will work with to develop the projects. There are a number of possibilities, though Kairos Power is a likely frontrunner given its existing deal with Google.

Kairos says its demo plant will generate 50 megawatts of electricity, with an eventual commercial plant producing 150 megawatts split between two reactors.

There’s no universally accepted definition, but SMRs tend to top out at 300 megawatts or so. By comparison, the most recently completed nuclear power plant in the U.S., Vogtle Unit 4 in Georgia, generates over 1.1 gigawatts of electricity, nearly four times the size of a large SMR.

Techcrunch event

Berkeley, CA
|
June 5

BOOK NOW

Silicon Valley has been smitten by SMRs. Startups have been rushing into the space, promising to slash reactor costs through mass manufacturing enabled by SMRs’ smaller size. That, coupled with the promise of 24/7 power that could be sited close to data centers, has pushed them to sign a number of deals with SMR startups, including Oklo, X-Energy, and the aforementioned Kairos.

Yet no SMR has been built outside of China. One startup, NuScale, has gotten close to building one, but it suffered a setback in 2023 when its utility partner canceled its contract after the estimated cost of the project more than doubled — even as the plans were downsized in an effort to contain costs.



Source link

data centers energy impact partners Google nuclear fission nuclear power
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Sam Altman is ready to decelerate | TechCrunch

July 28, 2026

PSA: your Claude shared chats and Artifacts may have ended up on Google | TechCrunch

July 27, 2026

Making sense of the panic over Chinese AI | TechCrunch

July 26, 2026
Leave A Reply Cancel Reply

Comment moderation is enabled. Your comment may take some time to appear.

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Latest
  • Samsung Galaxy Z Fold 8 review: a shot in the arm for the foldables market August 3, 2026
  • Best MagSafe wallets of 2026: Expert tested and reviewed August 3, 2026
  • ‘It’s without a doubt one of the least detrimental privacy-focused solutions to your mobile experience’: I spent a month testing GrapheneOS — and it almost made me ditch my Android phone entirely July 30, 2026
  • Low-power AI could define the next era of global innovation July 30, 2026
  • NYT Strands hints and answers for Wednesday, July 29 (game #878) July 29, 2026
We are social
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo

Subscribe to Updates

Get the latest creative news from Techzlab.

Tags
AI Amazon Anthropic Apple artificial intelligence ChatGPT cybersecurity data centers defense tech Donald Trump electric vehicles Elon Musk evergreens EVs Exclusive Fintech gemini Google Grok In Brief India Layoffs Meta Microsoft Mythos nvidia nvidia gtc Nvidia GTC 2026 Openai Perplexity Polymarket Redwood Materials sam altman Sequoia Capital siri social media Softbank SpaceX Spotify Tesla Tim Cook Truecaller Uber Windows X
Archives
Quick Link
  • Apps (403)
  • From the Editor (4)
  • Gaming (382)
  • Laptops (405)
  • Latest in Tech (404)
  • Mobiles (405)
  • Money (228)
  • Tech Insights (406)
Don't miss

Best MagSafe wallets of 2026: Expert tested and reviewed

August 3, 2026

I tested a premium Linux laptop that’s as light as it is powerful – here’s why I love it

July 29, 2026

Is the Electric Trike the Next Big Thing in Shared Micromobility?

July 28, 2026
Follow us
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
© 2026 Techzlab.com Designed and Developed by WebExpert.
  • Home
  • From the Editor
  • Money
  • Privacy Policy
  • Contact

Type above and press Enter to search. Press Esc to cancel.